Spoleto pile bulkhead
Micropile slide stabilisation system
Client
Private
Provided Services
Final and detailed design, construction safety management. Works supervision control.
Overall value
€ 695.841,33
Period
2021-2022

Design and supervision of the stabilization works on the terraces near the INPS school in Spoleto following a landslide in February 2013 due to collapse of the gabion retaining walls. The new retain structure is composed of low pressure micropiles and self-drilling tiebacks. Bulkhead type: anchored pile bulkhead
56
Total pile bulkhead length (m)
15.5
Total pile bulkhead depth (m)
18
Tieback length (m)